Pay applications

G702/G703-style pay applications, tied to your SOV

A pay app is only as good as the schedule of values behind it. Athena ties every SOV line to the contract and the cost-loaded schedule, then directs your AI to produce an AIA G702/G703-style pay application whose totals tie to the SOV and the contract. You review every number before it goes to the owner or architect.

Try it on a real job

Athena PM is $197/mo with 5 seats included and a 7-day free trial.

G702/G703-format Application and Certificate for Payment for example job 2701, Harbor Point MOB: application no. 3, contract sum $1,400,000.00, current payment due $305,437.50
Example A G702-format application summary, application no. 3 on an example job. Fictional data.

G702 vs G703 in plain English

The G702 is the Application and Certificate for Payment: the summary page with the contract sum, change orders, work completed to date, retainage, previous payments and the current payment due, plus signatures. The G703 is the continuation sheet: the line-by-line detail for every schedule of values item, with scheduled value, work completed this period and to date, stored materials, percent complete, balance to finish and retainage. Owners and architects expect both together.

Full G702-format page for example job 2701: lines 1 to 9, change order summary, contractor certification and architect certificate for payment
Example The full G702-format page: lines 1 to 9, the change order summary and the certifications. Fictional data.
G703-format continuation sheet for example job 2701: each schedule of values line with scheduled value, work completed, stored materials, percent complete, balance to finish and retainage
Example The G703-format continuation sheet, line by line, with contract totals that tie to the G702. Fictional data.

Download the example G702/G703-style PDF (fictional data).

Start with an SOV tied to the contract

Athena sets up the schedule of values with you, line by line, and reconciles it to the contract sum. Approved change orders are added as their own lines, so the G703 total always ties to the adjusted contract sum and the G702 summary ties to the G703.

Cost-loaded CPM to monthly billing forecast

With the SOV loaded onto the CPM activities, Athena directs your AI to produce the monthly billing forecast: gross billing, retainage and net billing by month, with the cumulative curve. When the schedule moves, the forecast moves with it.

Monthly billing forecast for sample job 2701: gross billing, retainage and net billing by month
Sample job Monthly billing forecast from the cost-loaded schedule.
Monthly billing table on iPhone: activities, gross billing and retainage by month, reconciled to the $1.4M contract
Sample job Billing table on iPhone, reconciled to the $1.4M contract.

Retainage, stored materials and change orders

Athena keeps retainage at the rate in your contract, tracks materials stored on site or off site separately from work in place, and only carries approved change orders onto the pay app. Pending changes stay on the change order log until they're approved. How the logs work.

Review before you submit

Athena checks that the G703 lines sum to the G702, that the total ties to the SOV and the adjusted contract sum, and that percent complete matches the latest schedule update. You review every number, sign and submit it yourself. Athena doesn't submit pay apps for you.

AIA, G702 and G703 are trademarks of The American Institute of Architects. Athena produces pay applications in that format through your AI and is not affiliated with or endorsed by AIA.

Frequently asked questions

What's the difference between G702 and G703?

The G702 is the Application and Certificate for Payment: the summary page with totals and signatures. The G703 is the continuation sheet, with line-by-line detail for every schedule of values item, including percent complete and retainage. Owners and architects expect both together.

Can AI do my pay app?

Yes, with your review. Athena ties your schedule of values to the contract and the cost-loaded schedule, and directs your AI to produce a G702/G703-style pay application as a spreadsheet. The totals tie to the SOV and the contract, and you review every number before it goes out.

How does Athena handle retainage?

Athena holds retainage at the rate in your contract, line by line on the G703, and carries the total to the G702. The monthly billing forecast shows gross billing, retainage held and net billing, so you can see cash flow before you bill.

Do the totals tie to the contract?

Yes. Every SOV line is reconciled to the contract sum, approved change orders are added as their own lines, and the G703 total ties to the adjusted contract sum. Athena flags any line that doesn't tie before you submit.

Try it on a real job

Athena PM is $197/mo with 5 seats included and a 7-day free trial.